Highway Charging Pile System Solution

Due to the popularity of new energy electric vehicles in recent years, expressway service areas need to provide charging piles to charge them.
The charging pile management system continuously collects and monitors the charging pile sites and each charging pile connected to the system through the Internet of Things technology, and solves the problem of monitoring the charging piles by the high-speed electricity management department.
Electric vehicles support IC card and code scanning charging methods. The remote charging pile system can remotely complete control commands such as start charging, forced stop, and unit price setting in real time. Users can scan the QR code through APP, WeChat, and Alipay applets. After payment, the system initiates a charging request and controls the corresponding Charging piles complete the charging process of electric vehicles.
At the same time, it provides early warning for a series of failures such as charger over-temperature protection, charger input and output overvoltage, undervoltage, insulation detection failure, etc.; it can be remotely controlled and provides functions such as financial statements and data analysis.

Difficulty

The Difficulty of Highway Charging Pile System

  • Data Delay
  • Local Control
  • Manual Statistics

Highlight

The Highlight of Highway Charging Pile System Solution

  1. Real-time Monitoring
  2. Remote Control
  3. System Analysis

Solution

The Solution for Highway Charging Pile System

Function

The Function of Highway Charging Pile System Solution

Platform home page

The home page of the platform displays the daily number of accounts opened, recharge amount, charging amount, charging degrees, charging times, charging time, the cumulative number of accounts opened, recharging amount, charging amount, charging degrees, charging times, charging time, and the corresponding month-on-month growth and year-on-year Growth and project information map navigation.t management, etc.

Real-time monitoring

The real-time monitoring page can display the map location of each site on the map, as well as the real-time data of the charging piles in each site.

Transaction Management

The transaction management package includes management items such as account transactions, order management, and transaction records, which provide convenience for users to trade and inquire. Click the corresponding item in the menu bar to directly enter the corresponding interface.

Fault Management

Fault management includes management items such as fault code, fault record, fault handling, fault analysis, etc., which provides convenience for users to manage faults and query.

Statistical Analysis

The operating trend can query the floating curve and data of the charging amount, charging degrees, and charging times during the period by day/month/quarter/year.

Safety Warning

Monitor the status of all charging piles connected to the platform. When abnormalities occur in the charging piles, an alarm signal can be sent to the operator through APP and SMS in time to eliminate fire hazards in time.

WeChat Mini Program

You can scan the code to charge through the WeChat applet, and pay the charging bill. Operators and property managers can manage and monitor the status of charging piles and charging transactions through small programs.

Related Products

DC Energy Meter for Charging Station with 2 Guns

Standard:

2014/30/EU

2014/35/EU

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Dual DC Circuits
  • Secondary RS485
  • DC1000V
  • 5s Accuracy

Three-phase Power Meter with MID for EV Charger

Standard:

2014/30/EU

2014/32/EU

2014/35/EU

IEC62052-11, IEC62053-22

EN61010-1, EN61000-3

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • 3P3L & 3P4L
  • Direct load 80A or via CT
  • Multi-Tariffs
  • Cost-effective

Single-phase Power Meter with MID for EV Charger

Standard:

2014/30/EU

2014/32/EU

2014/35/EU

IEC62052-11, IEC62053-22

EN61010-1, EN61000-3

 

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • 1-Phase 2-Wire
  • Direct load 80A
  • Multi-Tariffs
  • Cost-effective

Split-core Hall Sensor for DC Energy Meter

Standard:

IEC 61558-1

IEC 61558-2-15

IEC60364-7-710

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Capacity: 3.15, 5, 6.3, 8, 10 KVA
  • Noise Level: <40dB
  • Insulation Class: H
  • Short Circuit Voltage ≤ 3%
  • No-load Output Current ≤ 3%
  • Inrush Current ≤ 12 In
  • Leakage Current <0.2mA
  • Efficiency >96%

Request Information & Quotation

Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, [email protected]

If you have more detailed requirements, Please go to the relevant product page to submit the form.

    Top