Single-phase Power Meter with MID for EV Charger

ADL200-MID

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

  • 1-Phase 2-Wire
  • Direct load 80A
  • Cost-effective
  • Modbus-RTU RS485

Feedback

What Do Our Customers Say?

  • “ For over 4 years working with Acrel, they have continuously demonstrated excellent technical ability while ensuring superior customer service. Their collaborative approach and real time flexibility in adapting to changing conditions has contributed to the success of many project goals. "

    Arnold 

    Philippines

  • Cloud Platform for Power IoT is a synchronous integrated solution from energy meter installation to web interactive interface that can see the benefits of features with the first click mouse. Very convenient and fast. I will be with this product for a long time.

    Tuan 

    Vietnam

Highlight

What’s the Function of Acrel ADL series Single-phase Power Meter with MID for EV Charger?

Monitor

  • Voltage, Current, Power, Reactive Power, Apparent Power, Power Factor, Kilowatt-hours, Kilovar-hours, etc

Tariff

  • 1~4 kinds of Tariffs
  • Peak, Standard, Off-peak
  • 14 Time period by day

   Install

  • Convenient installation
  • Din-rail 35mm

Communication

  • RS485
  • Modbus-RTU

Specification

What’s the Specification of Acrel ADL series Single-phase Power Meter with MID for EV Charger?

Panel
Specification ADL200 ADL400
Phase Single-phase Three-phase

Parameter

What’s the Parameter of Acrel ADL series Single-phase Power Meter with MID for EV Charger?

Input voltage Reference voltage AC 220V
Reference frequency 50Hz
Power consumption <10VA
Input current Basic current 10A
Maximum current 80A
Starting current 4‰Ib
Consumption <4VA
Measurement performance Accuracy of measuring 1 class
Range of measuring 000000.00~99999999kWh
Clock accuracy Error≤0.5s/d
Active pulse Pulse width 80±20ms
Pulse constant 1000imp/kWh
Communication Interface RS485(A+、B-)
Connection mode Shielded twisted pair conductors
Protocol MODBUS-RTU

Networking

How does the Acrel ADL series Single-phase Power Meter with MID for EV Charger work?

Installation

How to Install the Acrel ADL series Single-phase Power Meter with MID for EV Charger?

PIN/Terminal Overview of ADL200 Power Wiring: 1-phase 2-wire via direct connect
Communication Wiring: RS485 wired Communication with IoT Gateway

Why choose Acrel?

  • 2003 Established
  • SZ.300286 Listed Company
  • 1200+ People
  • 25000+㎡ Plant
  • Factory Direct-sale

Request Information & Quotation

Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, [email protected]

If you have more detailed requirements, Please go to the relevant product page to submit the form.

FAQ

Got a Question? Get your Answer

What are the Main Advantages of Acrel?

We have our own Factory and R&D Center

What are the Difference between Acrel and other Brands?

Rich product series: Cloud Platform, Gateway, Protection Device, Power Meter, Transformer

What Certificates does the Company have?

CNAS, ISO14001, ISO27001, ISO9001

What Certificates do the Products have?

CE, IEC, MID, UL, EAC, ROHS, REACH

How Expensive is Acrel Products?

Competitive Price with High Quality

How long is the product Warranty Period?

2 Years

What is the MOQ?

Purchasing according to your needs, no MOQ limit

How long is the Lead Time?

Sample takes 3 days; Bulk purchase takes 1 month

AC & DC Energy Meter for EV Charger Station

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • DC & AC Charger
  • Single & Three Phase
  • RS485 Modbus-RTU
  • WIFI 4G MQTT  JSON

DC Energy Meter for Charging Station with 2 Guns

Standard:

2014/30/EU

2014/35/EU

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Dual DC Circuits
  • Secondary RS485
  • DC1000V
  • 5s Accuracy

Single-phase WiFi MQTT Meter for EV Charger

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Wireless Comms.:4G, WiFi (MQTT, MODBUS-TCP)
  • Wired Comms.:RS485 (MODBUS-RTU)
  • I/O Function:1-way DI & 1-way DO
  • Temperature:2-way Cable Temperature Measurement
  • Pulse Output:Active Pulse Output

Rectangular Split-core Hall Sensor for DC Energy Meter

Standard:

IEC 61558-1

IEC 61558-2-15

IEC60364-7-710

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Capacity: 3.15, 5, 6.3, 8, 10 KVA
  • Noise Level: <40dB
  • Insulation Class: H
  • Short Circuit Voltage ≤ 3%
  • No-load Output Current ≤ 3%
  • Inrush Current ≤ 12 In
  • Leakage Current <0.2mA
  • Efficiency >96%

DC Insulation Monitor for EV Charger

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • System: 200~1000VDC
  • Auxi. Power: 9~36VDC
  • Insulation Resistance: 20 kΩ~10MΩ
  • Response Time: 3 ~ 60s

Split-core Hall Sensor for DC Energy Meter

Standard:

IEC 61558-1

IEC 61558-2-15

IEC60364-7-710

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Capacity: 3.15, 5, 6.3, 8, 10 KVA
  • Noise Level: <40dB
  • Insulation Class: H
  • Short Circuit Voltage ≤ 3%
  • No-load Output Current ≤ 3%
  • Inrush Current ≤ 12 In
  • Leakage Current <0.2mA
  • Efficiency >96%

MID Power & Energy Meter for EV Charger

Standard:

2014/30/EU

2014/32/EU

2014/35/EU

IEC62052-11, IEC62053-22

EN61010-1, EN61000-3

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • Single phase
  • Three phase
  • Direct load 80A or via CT
  • Multi-Tariffs
  • Cost-effective

Three-phase WIFI MQTT Energy Meter

Standard:

2014/30/EU

EN IEC 61000

IEC 62052

IEC 62053

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • WIFI
  • MQTT
  • JSON
  • 3 phase

DC Insulation Monitoring Device for EV Charger

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • DC System: 100~1000VDC
  • Auxi. Power: 9~36VDC
  • Insulation Resistance: 1 kΩ~10MΩ
  • Communication: Modbus-RTU

Three-phase Power Meter with MID for EV Charger

Standard:

2014/30/EU

2014/32/EU

2014/35/EU

IEC62052-11, IEC62053-22

EN61010-1, EN61000-3

Certificate:

Standard Lead Time:
Sample: 2 days
Bulk: 1 month

Feature:
  • 3P3L & 3P4L
  • Direct load 80A or via CT
  • Multi-Tariffs
  • Cost-effective
    Top