What Do Our Customers Say?
Acrel is one of the best supplier for me. They are so easy to communicate and very friendly. They even give an online tour of their factory. Looking forward for more business together in the future.
Liezel
Philippines
“ For over 4 years working with Acrel, they have continuously demonstrated excellent technical ability while ensuring superior customer service. Their collaborative approach and real time flexibility in adapting to changing conditions has contributed to the success of many project goals. "
Arnold
Philippines
Cloud Platform for Power IoT is a synchronous integrated solution from energy meter installation to web interactive interface that can see the benefits of features with the first click mouse. Very convenient and fast. I will be with this product for a long time.
Tuan
Vietnam
What’s the Highlight of Acrel AIM Series DC EV Charger Insulation Monitor?
What’s the Application of Acrel AIM Series DC EV Charger Insulation Monitor?
What’s the Parameter of Acrel AIM Series DC EV Charger Insulation Monitor?
Power supply | 9~36VDC | |
Power consumption | ≤6W | |
System voltage | 200~1000VDC | |
Alarm | Over voltage | 110% System voltage |
Under voltage | 90% System voltage | |
Insulation monitor | Resistance range | 20 kΩ~10MΩ |
Alarm range | 20kΩ~10MΩ, 2 relay settable | |
Internal DC impedance | < 1MΩ | |
Output | 2 relay output, N/C or N/O settable | |
Communication | RS485 Modbus-RTU protocol | |
Fault record | 20 records fault | |
Installation | Din rail | |
Environment | Working Environment | -15~+55℃ |
Storage Environment | -20~+70℃ | |
Relative humidity | < 95% | |
Elevation | < 2000m |
What’s the Function of Acrel AIM Series DC EV Charger Insulation Monitor?
How to wire the Acrel AIM Series DC EV Charger Insulation Monitor?
Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, [email protected]
Got a Question? Get your Answer
We have our own Factory and R&D Center
Rich product series: Cloud Platform, Gateway, Protection Device, Power Meter, Transformer
CNAS, ISO14001, ISO27001, ISO9001
CE, IEC, MID, UL, EAC, ROHS, REACH
Competitive Price with High Quality
2 Years
Purchasing according to your needs, no MOQ limit
Sample takes 3 days; Bulk purchase takes 1 month
2014/30/EU
2014/35/EU
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
IEC 61558-1
IEC 61558-2-15
IEC60364-7-710
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
2014/32/EU
2014/35/EU
IEC62052-11, IEC62053-22
EN61010-1, EN61000-3
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
EN IEC 61000
IEC 62052
IEC 62053
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
2014/32/EU
2014/35/EU
IEC62052-11, IEC62053-22
EN61010-1, EN61000-3
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
IEC 61558-1
IEC 61558-2-15
IEC60364-7-710
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
2014/30/EU
2014/32/EU
2014/35/EU
IEC62052-11, IEC62053-22
EN61010-1, EN61000-3
Standard Lead Time:
Sample: 2 days
Bulk: 1 month
Kindly Fill out the Form below and tell us more about your Requirements,
We would like to provide Suitable Solution for You.
or Send us Email directly, [email protected]